Showing posts with label House Projects. Show all posts
Showing posts with label House Projects. Show all posts

May 14, 2017

House Project: Basement Family Room

Look a post not about the kids... kinda. Mike has been working hard converting the semi-finished half of the basement into a finished play/family room. I for one am SO EXCITED for them to have a space to get to run and play inside - not to mention toy storage that isn't our living room!

Here's the basement as we bought it:

And after some destruction, some electrical (that^^ was the light switch. It's now by the stairs) and some framing...

...lots and lots of framing and doors to the back and closet. The corner cabinet will be a TV stand and covers a pipe that pops out of the floor and the water shut off valves to the city.





Starting to drywall:


My dad came again and helped with some electrical (fixing old wiring to the lights and adding a circuit to the panel for a baseboard heater) and half the ceiling drywall. 

Done with drywall! On to mud and tape, and LOTS of sanding:

drywall dust escaping the basement

Now for the finishes! 
Paint!!
Lots more paint, baseboard and the cabinet topper. 
Topper for the shelf along the stairs. 
Painting trim
When your wife asks for risers on the stairs so they're not open, you measure and realize none of the steps are the same height... or level. Then you get whole new stairs. It's like If You Give a Mouse a Cookie, just for grown-ups :) 
More paint...
Cabinet door and window trim
Carpet install!
Finishing the carpet and moving in the toys!
Electronics set up courtesy of Auntie Amanda

AND IT'S DONE DONE!

including the baseboard heater. 

May 16, 2014

House Projects: Nursery



This room barely counts as a project room other than getting it all set up.
This is the room when we moved in. It was used for storing all of the 2nd floor furniture during the bathroom and master bedroom projects.


We had planned for it to be the kids room for when we started fostering. Now that Baby Girl is on the way too, it will be a combination nursery and kids room. I had picked out this crib bedding (Mudhut Etosha from Target) and was super excited to find out it has a matching set for the twin bed that we got from my parents.


After baby showers and filling the registry (thanks so much!!), it was really just to put it all together. It's a pretty full room, but the basement is planned to eventually be the family/play room, so it shouldn't be too full of toys.


There will be a navy blue painted letter of Baby Girl's first initial on the wall by the window, but we're not 100% set on a name - just in case we change our minds when we meet her. Sorry no hints :)

 

 Please ignore the mismatched valances. Just one was too short and unfortunately the two didn't line up when we got them. Next time the sewing machine comes out they'll get lined up and sewn together.


Still trying to decide what to do on the wall above the twin bed. 
I may paint a big tree on the wall but that seems like a lot of work, so it'll probably stay plain for a while at least. 


My big DIY's were the origami elephant mobile and the wall art. Plus I guess the mirror, but I made that in high school, so it doesn't really count. 


These are on the wall at the foot of the twin bed. 



To Do List
Set up and make twin and trundle
Wash smallest clothes and crib bedding
Set up and make crib
Organize clothes by size in closet
Hang curtains and valance
Take down valance and sew
Organize changing table
Set up details
Wall art
Bring home the baby!

March 28, 2014

The House: One Year Later

As of about 3 this afternoon, we have owned our house for one year. It's crazy to think that it's been that long, but also that short an amount of time! So much has changed in the house and in our lives - I graduated & started work with D6, Mike's company was bought out and now we're in the third trimester awaiting Baby Girl - but at the same time it feels like there is no possible way we've been here a year! 


To mark the occasion, here are some before and afters on our house projects:

The living room:

Before:

After:

The kitchen:

Before:

After:

The master bedroom:

Before:

After:
 

And the upstairs bathroom:

Before:

After: 

Soon to come:
Nursery/Kid's room
Dining Room

March 21, 2014

House Projects: Surprise! Dining Room Part 1

All was well on Wednesday afternoon. I had worked late on Monday, so I was home instead of being at the church. I sitting on the couch in the living room, thinking through my to-do list for the rest of the week as we have 4 people coming to stay with us Saturday night for a Sunday wedding. But then, I thought I heard a drip... and another... and then a hissing sound. I got up and looked in the dining room and found a giant bubble in the latex-paint-covered-plaster above the door connecting the living and dining rooms! I grabbed a couple towels and a bucket and luckily got them under the slight stream of water before the bubble burst, sending a waterfall to the now towel covered floor below. I called Mike, found out where the water shutoffs for the upstairs are (we have like 4 sets of valves instead of one shutoff for the whole house) and got them all shut off as he hustled home from work. The area of yellow that's missing is how big the water bubble was.


When we started busting into the wall and ceiling to remove the wet/moldy parts and get to the leak, we discovered that we actually have TWO ceilings in the dining room. Apparently the plaster had cracked in enough places that the old homeowners had wanted a new drywall ceiling, but instead of tearing down the plaster and lath, they just nailed up 1x2's and hung the drywall from the plaster. So we have drywall, an inch gap and then plaster and lath.


I have to say, it's kind of nice that in projects like this all the frustration that the project exists can get directed straight into the hammer swinging at the ceiling. Pretty cathartic :) By the time we had to stop for dinner plans with friends (a well deserved Pint Night at Old Main throughout which I may have seriously coveted Mike's beer) we had found the joint where Mike thought the leak would be and had made a dent in the wet drywall/plaster.


When we turned the water back on shortly on Thursday night to confirm the location of the leak, we discovered it was actually a different joint further down in the pipe. Not as easy a fix, but still a clean water line, so that was exciting and MUCH less gross than it could have been! Mike got started working on the pipe, cutting it to get the rest of the water out to be able to get it hot enough to work with on Friday night. Notice how wet the couple of remaining pieces of lath close to the pipes are. The leak is in that elbow. It had soaked the lath/plaster below it until it was wet enough to run down the 1x2 holding up the drywall (which ran along the joist above Mike's head) and into the wall above the door about 5 feet away, puddling in the plaster on the wall behind our pretty yellow paint. 


This is about half an hour before we reached the point of ceiling removal needed to get all the wet and/or moldy parts removed. We decided that it would be easier and possibly cheaper to take down the whole room worth of ceilings, and only replace the drywall instead of patching the plaster/lath and then the drywall. While we're in there, we're also going to install some can lights that were on our "maybe someday" list of to-do's for the house to make the room much brighter.


So we went to town tearing down the drywall, plaster and lath. However, we ran out of trash can space on Thursday night, so we had to pause demo and work on the massive amount of clean up needed to have 6 people staying in the house Saturday night.


Friday night the pipe got fixed, so both bathrooms are fully functioning to get ready for the wedding and to have the dining room back in working order (minus being pretty)! Next week we'll continue demo and start running the new electrical next week after garbage pickup on Monday. Here's the current dining room minus cleaning:



And to remind myself - I present the silver linings on the leaky pipe situation

  1. I worked late Monday so I was home to catch most of the water before it got to the floor/electronics despite usually working Wed afternoons. And even if it had, we don't have any carpet to be ruin! 
  2. It happened long enough before our company is coming that we should still have time to get both bathrooms up and running in time - the dining room just won't be as pretty. Not to mention it happened after our respite placement last week and before Baby Girl comes in June! No kiddos makes this much less stressful. 
  3. We have separate shut offs for the two bathrooms, so one still fully functions, meaning we can do all this work without worrying about where to shower when we finish late and crazy dirty.
  4. Adding more lights in the dark dining room will come much sooner!
  5. I've had a very tame pregnancy, so I can be just as helpful now as I would have been "pre-pregnant" AND we have friends already offering to help when we reach the stage where I can't really help anymore - I'm just not burly enough to help drywall a ceiling ;)
  6. I have a handy husband and a dad on call for questions about what to do when this kind of stuff happens! Plus this means we had all of the tools on hand that we needed for the first few days of demo including respirator masks, etc for when we found the mold.